home
about empower
products
empower clients
key personnel
contact us
business opportunity
jobs @ empower
downloads and news
 
  Time and Attendance Tracking – Hours Payable for Wages

 

   

 

This system uses 2nd hand PCs on the factory floor located next to staffs’ benches and machines. Manufacturers using the system so far confirm that “we were losing 30 minutes per staff member per day - at the 8 times staff were supposed to be working promptly at day start and around breaks during the day and were not”. The 8 times a day includes: 1 day start, 2 start of morning smoko, 3 end of morning smoko, 4 start lunch, 5 end of lunch, 6 start of afternoon smoko, 7 end of afternoon smoko and 8 day end. “Generally we were losing 8 minutes minimum at day start and day end - and we were on average losing 3 minutes minimum both sides of smokos and lunch – which totals 34 minutes per day. To be conservative lets say 30 minutes per staff member per day is lost – this equals 2.5 hours per staff member per week” For say a 10 man factory that is 25 hours lost production time per week – which equals 108 hours lost production per month. Most joinery manufacturers operate at a cost per hour of from between $50 to $65 (ie. Overhead recovery cost). Clients using “Empower Time and Attendance System“ advise us that “the cost of lost production in our 10 man factory was $5,400 per month – which is 108 hours at $50 an hour overhead cost.”

Empower’s Time and Attendance system reports all staff and all hours worked and wages payable report.

Special Price of licence examples

  • Up to 10 staff   $3,663
  • Up to 15 staff   $4,578

Contact us for more information

home | about empower | products | empower clients | key personnel | contact us | business opportunity | jobs@empower | downloads and news

© copyright 2002 - 2016 | Empower Software | all rights reserved | terms & conditions