Empower
Total Kitchen Solutions
All case studies
Custom KitchensCustomer Story

28% More Kitchens,$80k/yr Saved

Total Kitchen Solutions

At a glance

The wins for Total Kitchen Solutions

28%
More kitchens per month
$80k/yr
Saved in wage cost
Mt Gambier
South Australia

PCs on the factory floor at Total Kitchen Solutions in Mt Gambier turned into 28% more kitchens per month from the same team — and $80,000 a year back on the wage bill.

PCs on the floor

Managing Director Richard Hein put PCs at the workstations in the Mt Gambier workshop so staff clock straight onto jobs as they work. "Using PCs on the factory floor and Empower we get an estimated 28% more kitchens per month from our factory staff."

Same team, more output

The 28% lift came from the same staff — not extra hires, not longer shifts. Live time data made it obvious where minutes were leaking to non-value-added work, and the team acted on it.

$80,000 a year in wages

That productivity gain translated to $80,000 per year in wage cost savings — a number that compounds every year Empower runs the floor.

Zero Risk Software

Our Productivity Guarantee

You see gains like Total Kitchen Solutions's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Harrington Kitchens

First Look at Staff Time on Jobs

Narellan-based Harrington Kitchens went from no staff-time tracking to full visibility of every job — a fundamental shift in how the workshop is managed.

Read the story
Jag Kitchens

65% Increase in Factory Productivity

Auckland's Jag Kitchens more than doubled what the factory could turn out — a 65% productivity lift powered by live time data across every stage of the build.

Read the story
Elite Kitchens

~30% More Production Daily

New Plymouth kitchen builders Elite Kitchens estimate they'd lose ~30% of their daily production if Empower ever came off the floor — a decade of live time data is that load-bearing.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Harrington Kitchens

First Look at Staff Time on Jobs

Narellan-based Harrington Kitchens went from no staff-time tracking to full visibility of every job — a fundamental shift in how the workshop is managed.

Read the story
Jag Kitchens

65% Increase in Factory Productivity

Auckland's Jag Kitchens more than doubled what the factory could turn out — a 65% productivity lift powered by live time data across every stage of the build.

Read the story
Elite Kitchens

~30% More Production Daily

New Plymouth kitchen builders Elite Kitchens estimate they'd lose ~30% of their daily production if Empower ever came off the floor — a decade of live time data is that load-bearing.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Harrington Kitchens

First Look at Staff Time on Jobs

Narellan-based Harrington Kitchens went from no staff-time tracking to full visibility of every job — a fundamental shift in how the workshop is managed.

Read the story
Jag Kitchens

65% Increase in Factory Productivity

Auckland's Jag Kitchens more than doubled what the factory could turn out — a 65% productivity lift powered by live time data across every stage of the build.

Read the story
Elite Kitchens

~30% More Production Daily

New Plymouth kitchen builders Elite Kitchens estimate they'd lose ~30% of their daily production if Empower ever came off the floor — a decade of live time data is that load-bearing.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story