Empower
Delta Stock Crates
All case studies
Truck Bodies & TrailersCustomer Story

10% Increasein Factory Productivity

Delta Stock Crates

At a glance

The wins for Delta Stock Crates

10%
Factory productivity increase
Live
Manufacturing data capture
Feilding
New Zealand

Feilding-based stock crate builders — Empower captures live manufacturing data, driving a 10% productivity gain even without using every module.

The always-on picture

Darryl Coleman, Director — "We get accurate manufacturing data captured in real time. We can instantly see who is working on what and report on up to the minute data."

Even partial use pays back

"Currently we use only a part of Empower — we don't use Scheduling yet." Even without every module switched on, the live-data core is enough to deliver a measurable 10% productivity lift.

Manawatū stock crates

Delta Stock Crates build livestock transport equipment out of Feilding. Live workshop data keeps every build on the timeline it was quoted against.

Zero Risk Software

Our Productivity Guarantee

You see gains like Delta Stock Crates's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Duralloy Truck Bodies

~20% Less Time on Jobs

QLD truck body builders — Empower on workshop touchscreens replaced manual time sheets and cut ~20% of the labour time out of every job.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
Duralloy Truck Bodies

~20% Less Time on Jobs

QLD truck body builders — Empower on workshop touchscreens replaced manual time sheets and cut ~20% of the labour time out of every job.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
Duralloy Truck Bodies

~20% Less Time on Jobs

QLD truck body builders — Empower on workshop touchscreens replaced manual time sheets and cut ~20% of the labour time out of every job.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story