Empower
Elmhall Millworks Inc
All case studies
Commercial JoineryCustomer Story

Real-Time Issues,Real-Time Fixes

Elmhall Millworks Inc

At a glance

The wins for Elmhall Millworks Inc

50"
TVs running live dashboards
Real time
Issues visible + fixable
New York
USA

New York millworks — Empower dashboards on 50-inch TVs in the office and workshop show issues live so they get fixed live.

The screens in the workshop

Keith Murphy, Owner — "Empower shows us our issues and mistakes clearly and concisely on our 50-inch TV screens in the office and our workshop in real time so we can fix them in real time."

Everyone seeing the same data

"All management and staff can see the same data." Shared visibility replaces the guessing game — the office and the floor are looking at one truth, not two.

New York millworks, running lean

Elmhall Millworks build architectural millwork out of New York. Live dashboards turn a busy shop into a self-correcting one.

Zero Risk Software

Our Productivity Guarantee

You see gains like Elmhall Millworks Inc's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Tasker Joinery

20% Increase in Factory Productivity

Sydney commercial joinery — 20% more joinery out the door each month with the same staff. Their consultant estimated the profit lift at ~$220,000/yr.

Read the story
Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Tasker Joinery

20% Increase in Factory Productivity

Sydney commercial joinery — 20% more joinery out the door each month with the same staff. Their consultant estimated the profit lift at ~$220,000/yr.

Read the story
Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Tasker Joinery

20% Increase in Factory Productivity

Sydney commercial joinery — 20% more joinery out the door each month with the same staff. Their consultant estimated the profit lift at ~$220,000/yr.

Read the story
Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story