Empower
Tasker Joinery
All case studies
Commercial JoineryCustomer Story

20% Increasein Factory Productivity

Tasker Joinery

At a glance

The wins for Tasker Joinery

20%
More joinery per month
~$220k/yr
Consultant-estimated profit lift
Sydney
Commercial joinery

Sydney commercial joinery — 20% more joinery out the door each month with the same staff. Their consultant estimated the profit lift at ~$220,000/yr.

20% more out the door

Greg Tasker, Managing Director — "Using Empower we are getting 20% more joinery out the door each month. Our business consultant confirmed that a 20% increase in our factory productivity would increase our annual profit by an estimated $220,000."

The consultant's number

That $220k figure isn't Empower's number — it came from Tasker's own business consultant running the maths on what a 20% productivity gain means for a Sydney commercial joinery of Tasker's scale.

Sydney commercial specialists

Tasker Joinery focus on the commercial end — projects where deadlines are hard and specifications don't move. Empower keeps the workshop moving fast enough to keep both promises.

Zero Risk Software

Our Productivity Guarantee

You see gains like Tasker Joinery's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
Elmhall Millworks Inc

Real-Time Issues, Real-Time Fixes

New York millworks — Empower dashboards on 50-inch TVs in the office and workshop show issues live so they get fixed live.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
Elmhall Millworks Inc

Real-Time Issues, Real-Time Fixes

New York millworks — Empower dashboards on 50-inch TVs in the office and workshop show issues live so they get fixed live.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Ferndale Furniture

Bottom-Line Gains, Banked From Day One

Wellington commercial furniture makers — Empower banked bottom-line gains from the first year and kept adding value for eight years running.

Read the story
Elmhall Millworks Inc

Real-Time Issues, Real-Time Fixes

New York millworks — Empower dashboards on 50-inch TVs in the office and workshop show issues live so they get fixed live.

Read the story
The Woodsmiths

20% Longer / 50% More Unproductive Time if Removed

Northland joinery — 15 years on paper, then punch cards, now Empower. Going backwards to either would cost 20% longer jobs and 50% more unproductive time.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story