Empower
Equiptec
All case studies
Industrial EquipmentCustomer Story

10% Less Time,10% Less Cost

Equiptec

At a glance

The wins for Equiptec

10%
Less labour time per job
10%
Less labour cost per job
Napier
New Zealand

Napier industrial equipment manufacturer — tablets on the floor plus Empower gave workshop staff target times to beat, dropping 10% off both labour time and cost.

Before Empower, no target

Bruce Senior, Managing Director — "Before Empower there was no target time and therefore no meeting or beating of times." You can't manage against a target that doesn't exist.

Now, target times to beat

"Using tablets on the workshop floor and Empower Software, workshop staff focus on meeting and beating the times they are given as budgeted times." Visible targets change how the day runs.

Napier industrial equipment

Equiptec design and build industrial equipment out of Napier. Empower puts the workshop clock on the wall — and workshop staff take it from there.

Zero Risk Software

Our Productivity Guarantee

You see gains like Equiptec's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Global Pumps

~10% Less Labour Time, Full FTE Saved in Scheduling

Australia-wide industrial pump specialists — Empower + MYOB Exo interface saves practically a full-time scheduling role while cutting 10% labour time on jobs.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
Global Pumps

~10% Less Labour Time, Full FTE Saved in Scheduling

Australia-wide industrial pump specialists — Empower + MYOB Exo interface saves practically a full-time scheduling role while cutting 10% labour time on jobs.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
Global Pumps

~10% Less Labour Time, Full FTE Saved in Scheduling

Australia-wide industrial pump specialists — Empower + MYOB Exo interface saves practically a full-time scheduling role while cutting 10% labour time on jobs.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story