Empower
McMullen & Wing
All case studies
Project BoatsCustomer Story

38% Increasein Productivity

McMullen & Wing

At a glance

The wins for McMullen & Wing

38%
Increase in productivity
Weeks → minutes
Data entry & analysis
Live
Job status & performance

A world-class superyacht builder replaced paper-based tracking with Empower — instant feedback on job status and performance, and weeks of manual data entry shrunk to minutes.

A world-class builder, a paper-based system

As a world-class boat builder, McMullen & Wing needed a world-class way to manage complex production activities. Their existing paper-based system couldn't keep up with the volume or scale of what was happening on the floor.

Instant feedback in place of manual entry

By replacing the manual paper system with Empower, they gained instant feedback on job status and performance. What used to take weeks of manual data entry and spreadsheet analysis now takes only minutes.

Faster, data-driven decisions

Management can now make faster, data-driven decisions that keep large-scale projects profitable and on schedule — a 38% productivity lift that compounds across every build.

Zero Risk Software

Our Productivity Guarantee

You see gains like McMullen & Wing's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

46% Productivity Increase in 10 Weeks

Ten weeks in, factory productivity was up 46%. Three years on it had doubled — gains that compounded into roughly $200k a year in extra profit.

Read the story
EDS Engineering

30% Reduction in Job Costs

After comparing options nationwide and overseas, EDS chose Empower. Real-time visibility on times and jobs cut labour cost per job by an average of 30%.

Read the story
Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Montage Kitchens

20% Faster Kitchen Manufacturing

Live, accurate time data on workshop screens makes every kitchen maker accountable — Montage estimate they'd go back to taking 20% longer to manufacture their kitchens without Empower.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

46% Productivity Increase in 10 Weeks

Ten weeks in, factory productivity was up 46%. Three years on it had doubled — gains that compounded into roughly $200k a year in extra profit.

Read the story
EDS Engineering

30% Reduction in Job Costs

After comparing options nationwide and overseas, EDS chose Empower. Real-time visibility on times and jobs cut labour cost per job by an average of 30%.

Read the story
Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Montage Kitchens

20% Faster Kitchen Manufacturing

Live, accurate time data on workshop screens makes every kitchen maker accountable — Montage estimate they'd go back to taking 20% longer to manufacture their kitchens without Empower.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

46% Productivity Increase in 10 Weeks

Ten weeks in, factory productivity was up 46%. Three years on it had doubled — gains that compounded into roughly $200k a year in extra profit.

Read the story
EDS Engineering

30% Reduction in Job Costs

After comparing options nationwide and overseas, EDS chose Empower. Real-time visibility on times and jobs cut labour cost per job by an average of 30%.

Read the story
Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
Montage Kitchens

20% Faster Kitchen Manufacturing

Live, accurate time data on workshop screens makes every kitchen maker accountable — Montage estimate they'd go back to taking 20% longer to manufacture their kitchens without Empower.

Read the story