Empower
All case studies
Furniture Panel & BoardCustomer Story

46% Productivity Increasein 10 Weeks

Peppertree Furniture

At a glance

The wins for Peppertree Furniture

46%
Productivity gain (10 weeks)
100%
Productivity gain (3 years)
$200k/yr
Extra profit

Ten weeks in, factory productivity was up 46%. Three years on it had doubled — gains that compounded into roughly $200k a year in extra profit.

Ten weeks to a measurable lift

Peppertree didn't wait a quarter for results. By week ten on Empower, factory productivity was up 46% — a faster ramp than anyone on the floor had expected.

Compounding, not coasting

Six months in the gain had reached 86%. Three years in it had doubled outright. Each improvement built on the last because the data kept revealing where the next bottleneck lived.

What that's worth

Roughly $200,000 a year in extra profit — earned not through cutting corners or adding shifts, but by reading the factory's own numbers and acting on them.

Zero Risk Software

Our Productivity Guarantee

You see gains like Peppertree Furniture's in your first year — or we provide unlimited support, free of charge, until you do.

20–40%
Productivity increase

Faster jobs, greater workshop output — with the same overheads.

$5–$15k
Saved per month

Stop losing money to manual tracking and hidden inefficiencies.

7 days
To go live

Get Empower working on your floor in under a week.

More success stories

Floors doing more with Empower

Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
One 68 Shop Fitters

20% Less Labour Time & Cost

Melbourne-based One 68 Shop Fitters deliver retail and commercial fitouts across VIC — Empower cut 20% off both labour time and labour cost per project.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
One 68 Shop Fitters

20% Less Labour Time & Cost

Melbourne-based One 68 Shop Fitters deliver retail and commercial fitouts across VIC — Empower cut 20% off both labour time and labour cost per project.

Read the story
Arlo Express Sheetmetals

25% Faster Average Job Times

A 10-person sheet metal shop grew to 200 staff and $15M+ revenue without losing grip on margin — live time tracking on the floor cut average job times by 25%.

Read the story

30% Reduction in Labour Times

Manta Marine swapped manual tracking for live visibility of every task — labour hours per job dropped 30% immediately, and they say costs would jump straight back if they turned the system off.

Read the story
Compass Trailers

30% Increase in Productivity

Compass replaced manual systems with live floor visibility — letting management identify bottlenecks and keep staff on the highest-priority task. Output rose 30% with no extra overhead.

Read the story
Landquip Engineering

$67,500 Return on Investment

Landquip recovered $67,500 a year by replacing manual timesheets across 15 staff. Touchscreens on the floor cut manufacturing times 20% and downtime 50%.

Read the story

6x Total Production Growth

Workshop displays paired with Empower let Makaira reshape their production line and cut non-value-added labour — driving a six-fold lift in total production.

Read the story
DNA Boats

20% Less Time, 20% Less Cost

Nelson-built DNA custom trailer boats — every hull bespoke, every hour tracked. Empower cut labour times and costs 20% each across the workshop.

Read the story
MWF Joinery

30% Increase in Factory Productivity

Christchurch commercial joinery specialists MWF build hospitality fitouts and bespoke interiors — a 30% factory productivity gain that lets them take on more of the ambitious briefs.

Read the story
One 68 Shop Fitters

20% Less Labour Time & Cost

Melbourne-based One 68 Shop Fitters deliver retail and commercial fitouts across VIC — Empower cut 20% off both labour time and labour cost per project.

Read the story